Actively Contributing to the National Energy Project, PT Elnusa Petrofin and PT Elnusa Tbk Hold Go Live Supply BBM Project Marine Seismic 3D Bone Seram in Makassar

Elnusa Petrofin through the Fuel & Lubricants Trading and Business Support function with PT Elnusa Tbk holds Go Live Fuel Supply (Biosolar) Marine Seismic 3D Bone Seram Project on April 20, 2024 in the Makassar Anchorage area. This project is a strategic collaboration between PT Elnusa Tbk and China Oilfield Service Limited (COSL), as the owner of the Hai Yang Shi You 760 seismic vessel.

Elnusa Petrofin’s involvement in this project is a synergy between the Elnusa Group and a commitment to fulfill the Domestic Component Level (TKDN) component requirements. Elnusa Petrofin is entrusted to provide fuel for the Hai Yang Shi You 760 vessel operating in the Bone Seram 3D Marine Seismic Project which runs from mid-March to July 2024, with an estimated order during the project of 2,000KL.

As a handling agent, Elnusa Petrofin was appointed to supply 640KL of fuel to the Hai Yang Shi You 760 ship in the Makassar Anchorage area. Biosolar fuel was taken from Pertamina Patra Niaga installation in Makassar and transported using SPOB Duta Pertiwi V. Hai Yang Shi You 760 continued its journey to the project area around Seram waters, Maluku. Previously, Elnusa Petrofin had successfully supplied 440KL of fuel to the AHTS OPS ALHENA vessel in the Lamongan Anchorage area on March 30, 2024.

Elnusa Petrofin always upholds HSSE principles in every operation, this project is one proof of Elnusa Petrofin’s commitment to continue to actively contribute to supporting the national energy industry and strengthen its position as a strategic partner in the oil and gas sector in Indonesia.